JRC Petten is currently realizing a construction project for the complete renovation of the entrance to the site called IPE (integrated Petten entrance). The project consists of two sub-projects, the <building project> which is currently under construction , and the <exterior security measures> project which is the subject of this request (named : IPE exterior security measures)
The <IPE exterior security measures> project includes :
• Installation of 2x4 automatic retractable bollards to protect the facilities from high-speed hostile vehicles
• Installation of eight light-duty barriers to control vehicle access and security checks;
• Installation of 4 speed gates (night gates) to prevent unauthorized individuals or protesters from entering the site.
• Installation of the fixed fences around the new security and entrance building and between the security gates
• Installation of license plate camera, speeding camera, traffic signing speed/parking/traffic rules), detection loops, anti-collision flowerpots and two flag poles
• Integration of the exterior security measures to the controls of the security control room and the guard house
Lose (1)
Interessiert an dieser Ausschreibung?
Melden Sie sich kostenlos an und erhalten Sie automatische Benachrichtigungen für ähnliche Ausschreibungen mit KI-gestützter Analyse.